I welcome you, dear guests and fans of my channel!
Finally I came to write this article on the masonry of your own home. I'm not going to split it into several parts, describe everything as it was in one longride (long article).
Since the channel young and Zen systems had to recognize the channel themes for ranking, I began to publish articles, breaking into pieces all the basic the process of construction of the house - on the smaller items that require special attention in the construction process, in particular: the foundation, bridges, quarry cap. Singled articles on brick and stone. Therefore, when writing this article, I'll make the text links, and if you are already familiar with these materials, go through these links by))).
So...
Buying land and construction planning, I already knew and expected that most of the work will make its hands, and, accordingly, chose land for building on the basis of the conditions that will live and build a house on the same earth. In connection with what has been selected portion with a small two-room house 54 meters, located at the front portion, and a place for building was in the yard (Link to the publication)
Strip foundation was poured in July 2017 and in the same year I put the plinth of rubble, just managed to make before the frost backfill for floors on the ground. (Crushed cap,backfilling, Foundation).
In May 2018 I invited a friend builder from Uzbekistan, he came to me and put a box at home. By that time, namely, in late winter, I bought all the necessary building material: brick zabutovochny, ceramic block, sand, stone, masonry grid, etc. Just turn an ordinary building brick in color (Reference to the preparation of bricks). Cement took over the fact that non-caking ...
That's the end of May it all started ...
The first step is rolled out cutoff moisture waterproofing of the basement of the house and built a few rows of blocks. Between each adjacent - cell mesh stacked basalt 12h25.
As long as the builders laid ceramic block, I bought fresh white cement (manufacturers - Turkey and Iran) for lining and after the installation of the six rows of blocks went bricklaying.
Masonry mortar with white cement is not different from the conventional gray. The only thing you have to remember that the white - made M600 brand and gray - M500.
The seam has been selected under the old-fashioned way, in fact as well as himself a brick (description weld formation HERE). In the process of masonry, I specifically asked the master to perform the masonry is not strictly under the line, otherwise I would not get this effect of antiquity, which is now.
Even sometimes scolded, too smooth masonry))).
Working alone, a master was packing 60 blocks in a work day, or 200-250 bricks. When laying bricks - colors are not specifically chosen, the builder took everything at your fingertips. The detailed process is described in my article - Bavarian masonry! Thus, it is going to the construction of the top row of window and door openings.
Jumpers over the windows, it was decided to do well out of facing bricks with no corners, so in every window frame was constructed formwork and masonry made to poke! Such bridges, I wrote in the article "Brick bridge without corner". For webs used solution M250, M600 1 part cement and 2 with a small portion of sand.
Next, it was necessary to construct overlap. Since travel technology section depth was unreal, the cranes, concrete pump can not work on-site construction, the abandoned concrete slabs at the stage of designing the house. In this connection, made of wooden beams overlap.
Bruce used 150x200. Since the beams are visible in the interior, I had to do roasting and polished wood. This is described in detail in the article "Firing beam".
Further, according to the plan - second floor. After mounting the ceiling again returned to the clutch! Roof - Roof, so laying a 1.6-meter core walls of the attic - the builder started the gables.
On the second floor is coming on for much longer, since one and the same person brought a Statement, on a raised floor and put! Over time, I did not pursue so much no one hurried. The whole house was built by the middle of September 2018, t. E. for 3.5 months.
Until the end of autumn I had to cover the roof and make the insulation, which is made and relevant publications:
Truss system in the two arms. As I was doing the roof.
How to make the insulation of the attic from inside the house? My experience.
Just at the end of the end of the deck of the roof and installation of windows - I released the final article of the money spent on the construction of the home box.
Brick house 8h10m. Box 2019.: 1.336 million rubles.
At this until all! If you thought I missed something out of sight and did not specify, ask in the comments or in person, write, I'm really interested in your opinion!
In the next block of articles I will talk about finishing and interior with their own hands, masonry gazebo and barbecue from the rubble, about landscape design and landscaping their yard! It will be interesting!
Thank you for your attention!