Mistakenly builders dug a foundation pit on the next site

  • Dec 24, 2019
Photo taken from the car and his wife - Pouring the concrete foundation
Photo taken from the car and his wife - Pouring the concrete foundation

I welcome you, dear guests!

Incident occurred in the suburb of Rostov-on-Don.

Parents podnakopili some money and decided to buy a plot to build a small house. One of the conditions for which the choice - on the shore of a pond. We in the Rostov region of such options does not say that much, but there are plenty to choose from.

Figured "what-where-how do", and decided to travel to different parts of the area - within a 20-40 km. from our city.

One of those places where there are many water bodies flowing into the Don - is the Azov district. Just in the area of ​​local administration have recently been isolated field where produced cutting (surveying) plots for individual housing construction, and construction is already well under way. But you can still have time to pick up and grab the right place.

We found a place ...

We approach to the protection, we opened the gate and we drive deeper into the field of rut. Just as we were given a copy of the plan, indicating which of the sites purchased, which in reserve - well and which ones are free, respectively.

instagram viewer

As we move to the left and right are already delimited areas in the corners of which hammered pegs with the numbering areas are all about 6-8 acres.
... orient the map and go to the shore.

We drive on the first line, what is the waterfront, and we are already beginning to look directly at the free sites! On the line is already under construction in full swing. Most of the sites are occupied by technological machines - excavation is carried out under the foundations. Excavations are all the same size and the same configuration, - As it turned out, the developer took a few sections in a row and does business!

Busybodies several teams, somewhere dig somewhere constructing reinforcement cages, and in some cases already poured concrete.

Learning from the plan... We drove up right next to one of the vacant lots, and it boils Construction - knit frame on the plate! Once again twisted and turned the paper, well, there is no mark, he sold or held in reserve. Or forgot to put the cross, or we read the wrong plan.

Out of the car, I checked the number on the plan and on the number plate - all the same!

Dialogue with builders

I ask the children, "Who is in charge?". Suitable slowly to me Armenian and says: "schA! Chef busy ten minutes ", and points to the guy about the concrete pump.

Further, such a dialogue with him:

Me: "And you can talk to you?"
Armenian: "Yes, and Th is it?"
Me: "I looked kind of like not occupied land, and work is going on ..."
Armenian: "Error at you, we're well aware, we were shown where to work - and work there"

And coming to us probably their boss))). I ask him to properly orient me: is installed in the ground plate or may lie in the error term!

He looked around, compared numbering. Calls up two more, three of them extend far and begin to consult... (Approximately 2-3 minutes)

Further, their whispering grows into the scandal, both of them blush in the face of change and begins the hard op for the whole neighborhood! ))). The intensity continues, the third and starts already interferes shove them. Fervor subsides after a minute or two. Then just talk in a raised voice: "You yourself pointed out to me as the place of development?", "Pointed out, but you did the same plate №147, and plan everything there, Che you climb to a foreign land?" - well, stuff like that ...

And I'm waiting for an answer, and so I stand in place until... Willy-nilly, "Gray's ears")))

As it turned out, within 5-10 minutes incandescent dispute - it was the foreman and the customer - probably for a long time are familiar, because They spoke on "you", one of them or both overlooked numbered plates, and all 6 of foundations shifted to one site in side.

One justification - indeed, we are confused themselves when traveling. The plate stands on the border between one and the second section, and clearly it is not clear which of the two sites it belongs!

Here is the case in Russia)))

What is the result?

We chose the site not far from this place. I came back a week later and with builders of words - the customer bought a seventh site and is now building instead of six - 7 houses!

The process of laying his own house from A to Z.

How to determine the height of any object near or at a distance?

The first experience of a plasterer! Plastering under tiles on plaster beacons in their own hands.

How to make the insulation of the attic from inside the house? My experience.

Bavarian bricklaying. The layout and the selection of shades.

________

If you liked the article, place and Likesubscribe to my channel!