That's got to the next stage after the construction of the overlap lag, and this article will tell you how to perform the pipework from the collector to the heating radiator network.

As heating devices selected steel radiators with bottom connection, in that in each of the rooms at the window I made Stroebe masking composition pipe. Grooves made deep - approximately 10 cm, as they will be made assembling tube rotated 180 deg..

Copyright Photo - Grooves
Copyright Photo - Grooves

Since the heating system on the second floor - "Ray" (collector), a tape was made of length measurement runs from the manifold to each of the radiator and according to line deposited on the tube, cut off the respective part.

The main thing is not to confuse what the return line in the design of the radiator with bottom connection is on the right (the one that is closer to the right edge of the radiator), feed - to the left!
Copyright Photo - bend pipe
Copyright Photo - bend pipe
Copyright Photo - bend pipe
Copyright Photo - bend pipe
instagram viewer

Started laying track from the radiator to the collector. The first thing a pipe packed the entire length of the heater. Then, by the spring end bent by 180 deg., And wound up in Stroebe pressed metal plate to a beam overlap.

Copyright Photo - Laying of the heating pipes
Copyright Photo - Laying of the heating pipes
Author photo - Heating Installation
Author photo - Heating Installation

The most difficult part turned out to be - when laying pipes across the wooden log.

Since the bearing joists planned to do a design element, and they will not be filed with the side of the first floor, had to produce drank lag and keep track of them, and not along the main beams.

Copyright Photo - Laying of the heating pipes
Copyright Photo - Laying of the heating pipes
Copyright Photo - laying heating pipes
Copyright Photo - laying heating pipes

The whole process of installation of pipes, I spent 2 days off. It now remains to make a sex pie: put the heater and make plywood flooring, and will continue to hang radiators.

Based on the experience gained note that the process of unwinding and straightening bay composition pipe interspersed with walking on logs, when the feet are one and the case - are folded for one person - nervous occupation ))). double, Why should the work go faster twice!

At this until all, thank you for attention!

And of course do not miss the flooring sub-floor)))! You can also subscribe HERE!

1.If the diagonals are equal, it does not mean that you have a steady home. Why? I tell the story!

2.Why is the main size of metal products is in the length of 11.7 m.?

3.Variants of construction of right angles in the construction of the house and check the angles at the already erected.