After much deliberation on the subject of the choice of the overlap of the first floor, I decided to make a wooden floor, exposed beams in the living room. Maybe not quite logical to use these slabs in a stone house, yet the decision is made...
It would be desirable in natural materials at home, as comfortable as you will agree !?
The first thing I looked for a bar to the desired cross-section spans between the supporting walls 4.6 meters. According to the calculation for such overflights took place timber height from 220 to 250 mm, but we have such a height considered "Not standard", so I had to replace it with a 150x200 increasing quantity and decreasing the step of laying up to 700 mm.
Having traveled a dozen bases and Timber sawmills, find the desired option, both in size and price (8700 rubles. / Cu. m.)
And the long-awaited moment arrived, unloading is made, and I began to stack timber to a little dry ...
Laying produced with gaps for ventilation, otherwise the tree starts syret and sometimes mold is formed first, and then the destruction of the wood.
To prevent bending and torsion beam at drying, I had crushed masonry block.
As such, the timber was about four weeks. A couple of pieces slightly arched, but not critical. In just a few days before the assembly, I made a roasting from a conventional gas burner, and chose the burnt fibers brashirovochnoy attachment for drills.
Firing produced as long as the line does not become completely charred, and only then brushed and polished in places. Once all the beams are ready for installation - I covered them with an antifungal compound.
Laying and installation is made on the threaded studs 22 mm woven into the reinforcing cage is reinforced belt.
That in the process of building a bar is not bent on pallets of bricks and blocks, the center was built bearing beam, standing across the bar along the living room.
Since wood - natural material, which is prone to decay from a surplus moisture during assembly between the facade and the end of the beam material must leave about 5 centimeters for ventilation, as well as to prevent rot in the junction to the stone structures, two layers laid roofing material.
Good luck building, dear readers!
If you liked this article, place and Likesubscribe to my channel!There is a lot of interesting topics for you!