Error 1. Purchase and storage of log house in the warm season. The ideal time to purchase wooden base - it is winter. Immediately after the logs are delivered to the site, they are stacked and covered with roofing material. They are also recommended to install the timber - for better safety.

Error 2. Inconsistency in the construction stages. Primarily in the construction of the bath is poured foundation. One of the most convenient and practical option is to tape. From columnar it is characterized by its durability.

Error 3. Rushing into installing the framework. The foundation takes time to harden. Otherwise, the frame selling lower structure and the walls are straight. The same mistake should be avoided when installing doors and windows. To shrink the house requires at least a year.

Error 4. Ignoring the cracks and joints. Constant drafts in the bath - this is intolerable. To protect yourself from them is enough to close up the wall with the help of log moss. After placing the moss bath caulk is necessary.

instagram viewer

Error 5. Cheap materials. Logs for the bath - the one item of expenditure that can not save. They determine the quality and durability of the future building. It is important not to buy sawn and felled logs.

Error 6. Lack of a clear project in mind baths. Before the construction should have a clear plan of the building. Taking into account the height of the premises and the location of windows and doors. To determine the windows, you need to know exactly the order in the bath rooms.

Error 7. Improper installation of the furnace. When placing the furnace it is important to remember that its pipe must not come into contact with the rafters or roof ridge. When choosing a stove, the owner of the bath is not guided by the desired capacity and the volume of the room itself. Furnace type defined heated area.

Error 8. Abuse of synthetic materials. When creating a log of the bath is not recommended to use artificial insulation. Materials such as polyurethane foam or behave unpredictably at high temperatures. It is worth paying attention to the organic insulation - such as jute, linen, hemp and felt.

Error 9. Ill-conceived system of ventilation. Ventilation - is key to the security of all people who use the bath. Limited to a through-hole on the ceiling is possible only if the room is rarely used. If steam is warming more than two hours, requires the installation of the forced air circulation system.

Error 10. Too bright lighting. lighting error is very common, because of obvious clues to select no lights. The optimal solution is to buy a lamp power of 25 watts. All lamps must be protected from moisture.

Error 11. Installing large windows. Large windows allow natural light to make and add comfort. But it must be borne in mind that the overall frame will contribute to hot air leaking out. This factor will make spending more time on the heating steam.