Bath from a bar 4x4 m: free project

  • Dec 24, 2019

layout

Development plan of the bath timber is based on the preferences of its owner. However, when creating a drawing is recommended to include the following

  • steam bath room + oven. Steam - it is central to the bath. Its approximate area of ​​2,5h2 meter;
  • washing room. The Visitors washing baths are rinsed with water after heating;
  • dressing room. In this part of the construction is a place to relax and to accommodate clothing. The shape of the dressing room is rectangle 1,5h4 meter;
  • terrace. An additional element that is used in the summer. It opens access to fresh air immediately after the bath procedures.
Project
Project

Action plan

Construction bath from scratch takes place in the following order:

  • laying the foundation;
  • Installation of walls;
  • placing the lid;
  • Building finishing outside and inside.

Foundation

The foundation must be built to cope with the heavy weight of the furnace, because for him chosen piles. laying the foundations for future bath is carried out in several stages:

  • the place is purified by the plants;
  • instagram viewer
  • applied markings - for this you need a nylon string and stakes;
  • Asbestos laid pipe (pitch length - 1 m);
  • solution was poured into the tubes of crushed stone, cement, sand and water.

Walls

To install the four-meter wall will need rails, which have a section of 15x15 centimeters. The materials are stacked and the length of said slipping. So that the wood will last longer, it is recommended prokonopatit jute.

Love bathe on weekends and can not imagine my life without the bathhouse? Put Like and subscribe to the channel "bath | From A to Z" !New articles every day!

Advantages timber before framing bath are as material. The advantages of this material include:

  • environmental friendliness;
  • strength;
  • insulation (= savings on heating devices).

Roof

As a gable roof used format - it is optimal for the bath. wooden rafters (10x4 cm cross section) are used to create a roof. In order to save it is covered by one of the two materials:

  • galvanized sheets;
  • metal.

At the request of the master ramp is displayed on either side of 50 centimeters. This area is sufficient to build a woodpile.

decoration

To bath was comfortable to use at any time of the year it is necessary to insulate the walls from the inside. Warming takes place on such a plan:

  • walls and ceiling obbivat using wooden strips;
  • between rails fixed foam / polystyrene / mineral wool;
  • top foil tensioned insulation seating staple gun to the rails;
  • last layer applied pine siding or lime.

For thermal insulation of the ceiling or concrete block used Penoizol.

Due to the fortress of timber, finishing outside the bath does not require much effort. It includes a few "cosmetic" procedures:

  • otshlifovki surface;
  • woodwork antiseptic (prevent rotting and pests appearance);
  • processing antipyrine (construction prevents fire).