Inexpensive skeleton bath with his hands

  • Dec 24, 2019
click fraud protection

To save on construction of baths, site owners are thinking about how to build a sauna with your own hands without the aid of professionals

Thanks to advances in technology, everyone is given the opportunity to build. bath of the modern inexpensive materials, it does not even need to install the frame and use the services of specialists.

In this article we will discuss the construction plan, as well as materials and construction plan, which is required for an inexpensive construction.

Preliminary design

Bath 6 x 6 meters
Bath 6 x 6 meters

The materials that will be required for the construction of baths:

  • timber 100x100 mm. board 150h50 mm .;
  • roofing material, min. wool;
  • board for interior decoration (suitable linings)
  • boards for exterior finish or withteklomagnezitovye sheets.

building plan:

  • cleaning abstracted area under the foundation;
  • pouring of the foundation;
  • installation of partition walls;
  • installation of roof and roof;
  • interior and exterior trim.

Foundation

Frame bath very light, so it would be enough for pier foundation, but the length of the column will depend on the soil for clay soil will be enough

instagram viewer
30-40 cm. foundation for sandstone and loam on the need to deepen the foundation 100-150 cm.

It is not recommended to pour the foundation width less than 250-270 mm.To enhance the foundation, the foundation is poured on top of the columnar tape, depending on the size bath.

Frame walls

Construction of the walls begins with the cap binding, need to install it timber 100x100 mm., Which has been previously treated with antiseptic bar fixed on nails or staples.

On top of the beam set supports, which are strapped boards 50h150 mm. When installing the vertical supports check flatness using a spirit level.

The gap between the uprights should be the width of the insulation, which you will use. Pre-aware place where it will be installed door and window and ventilation.

The roof and the roof

Roofing boards are used with 150h50 size mm. Truss system to collect the most convenient on the ground, and after the set on top of the frame. On top of strapping need to put one more level of timber (mauerlat), Which is a base for the roof.

After installing the truss system is made sheathingWhich was covered with roofing material.

inner workings

Inside the bath was covered floor. For this strapping attached to the joists beams size 50x50 mm, first spreading subfloor on which is laid a layer of roofing material, after which the floor is insulated with mineral wool and closes the top of the finishing floor.

Ceilings and interior walls sutured lining, and under it necessarily fit steam, and an additional layer of insulationThat you bought. Drawn up windows and doors.

Yes, it is only a brief description of the work processBut it is meant to help you see the milestones, as well as understand what you can do yourself and what work will need to call professionals.

Place Like and tell us about their experiences of building saunas.