Good day, dear friends!
In November 2019 I put the front door, and thus bullet in the completion of this step - in erecting boxes.
The other day picked up all their records and share this article with you and am bringing the total for the cost of the delivery of construction materials for each stage. There will also be added to the cost of unloading as well as the delivery without it does not make sense.
Until recently, I did not know the amount of the costs for shipping and considered it only during the preparation of material for writing, so:
Foundation
Delivery of building materials for the device strip foundation is as follows:
- Concrete:. 350 rubles / cu. m. x 31 = 10 cubic meters of concrete 850 rub.
- Fittings (long measures): 2400 rubles. + Unloading 800 rubles. = 3200 rubles.
- Timber formwork to 800 rubles. + Unloading 200 rubles. = 1000 rubles.
Total: 15 050 rubles.
plinth
Further, the facing of the plinth part I made of rubble granite stone, which carried from the quarry. The basic material loadable higher floors - concrete (manual preparation). Just at this point I will add backfill the basement part - which will serve in the future for floors on the ground.
Delivery device for the basement of the house is as follows:
- Crushed stone: 2400 rubles. (Bulk)
- Sand for concrete and for backfilling 4 x 15 4 x t.: 1000 rubles. = 4000 rubles.
- Crushed stone (12 m.): 1000 rubles.
- Cement (30 sacks): 500 rubles. + Unloading 600 rubles. = 1100 rubles.
Total: 8500 rubles.
Ground floor
Ground floor screed used mechanized way, the delivery of happened:
- Delivery Pneumosupercharger manipulator: 2 200 rubles.
- Sand 1 x 15 m.: 1 000 rubles.
- Cement (36 sacks): 500 rubles. + Unloading 700 rubles. = 1200 rubles.
Total: 4 400 rub.
masonry walls
The walls are made of a ceramic block and zabutovochnogo solid bricks, delivery amounted:
- keramobloka Delivery 4 call handler: 4 x 4000 = 16 000 rubles.
- Delivery of bricks 3 call handler: 3 x 4000 = 12 000 rubles.
- Cement (White M 600): 1200 RUB. + Unloading 1,000 rubles. = 2 200 rbl.
- Cement (Gray M 500): 500 rubles. + Unloading 1,000 rubles. = 1500 rubles.
- Sand: 4 x 15 m.: 4 x 1000 rubles. = 4000 rubles.
- Crushed stone (12 m.): 1000 rubles.
- Fittings for Laying nets and mesh: 400 rub. + Unloading 200 rubles.
Total: 37 300 rubles.
overlap
To cover the wooden beams according to the calculation of required bar section 150x200. But in Rostov-on-Don this size is considered to be exclusive, and therefore had to overpay a little bit and bring order.
- timber shipping 2400 rubles. + Unloading 800 rubles. = 3200 rubles.
- Insulation: shipping 1500 rubles. + Unloading 1000 rubles. = 2 500 rbl.
Total: 5 700 rub.
Doors and windows
About windows, I can not tell you the exact price of delivery, as brought free, most likely lies in the price of the cost of the windows, so take only the front door: 1200 rubles.
Roof
- Delivery of lumber to truss system and crate: 800 rub. + Unloading 1500 rubles. = 2300 rubles.
- Insulation: shipping 1500 rubles. + Unloading 1000 rubles. = 2 500 rbl.
- Metal and water drainage system: 3200 + unloading 1200 rubles.
Total: 9200 rubles.
engineering systems
If an electrician fit in the interior of the vehicle, the components for heating, water and sanitation had to execute delivery.
- Delivery: 2 x Flight 500 rubles. = 1000 rubles.
Total: 1 000 rubles.
Chimney
The steel chimney liner for a device inside the walls of a boiler and a fireplace: the delivery of the Moscow transport company - 2 200 rubles.
in total
- The foundation of 15,050 rubles.
- Cap 8500 rubles.
- Ground floor 4400 rub.
- Laying 37 300 rubles.
- Overlapping 5700 rubles.
- Doors / windows 1200 RUB.
- Roof 9200 rubles.
- Engineering Systems 1000 rubles.
- Chimney 2 200 rubles.
The total amount of 84 550 rub.
And it is only as long as the four walls without decoration!
He completed the construction of spring 2019, then engaged in communications. In November 2019 put the door, the overall cost only a box left in 1336850 rub., including delivery of material 84 550 rubles. And this is a moment of 6.3%.
At each stage of construction on my channel there are publications, as inYou may find detailed cost estimate for the construction of my house HERE.
The process of laying the house from A to Z
Why is the main size of metal is 11.7 meters in length.?
If the diagonals are equal, it does not mean that you have a steady home. Why? I tell the story!