In baths building cedar timber is no big deal, you must adhere to the following steps during the construction and the entire process will not cause you any trouble.
Stage №1. Drafting bath project. The first step is to create an outline of your future bath. It is better to consult a specially trained craftsmen to help you create a project with a bath according to your wishes, will give useful tips on designing issues. The final plan should contain basic information: the area and the number of individual rooms, the wall thickness, arrangement of the main communication nodes.
At the same time it is necessary to conduct soil analysis, which will be located bath. Depending on the results obtained, it will vary the composition and method of laying a foundation.
stage №2. Pouring the foundation. An important stage of construction. On how well it will be executed it depends on how long an bath as a whole. The foundation is chosen based on the type of soil. If the site has multiple uneven terrain, the best solution is the use of metal piles.
If a relatively flat portion, it is more rational for this is to use a rod or columnar foundation. It is necessary to take into account the fact that the tape option will take more time to install, since it will need additional 28-30 daysIn order to solidify.
stage №3. Installation crowns. When the foundation is completely hardens, it is covered with a layer of bitumen, which will be installed waterproofing. The most popular options include roofing material itself.
This procedure is repeated twice. insulation sheets must be mounted overlapping.
When installing the boards of the most important thing is to make high-quality installation of the first row. Material for it to be of identical length with a thickness greater than the other bars. So if the thickness of the walls is planned 20 cm., The crowns in the front row must have a section 25-30 cm.
Step №4. Roofing. Immediately roof consists of two parts: a supporting part (rafters) and deck intended for fixing the roofing. Under the roof if you wish, you can make a small attic, but it must be noted in advance in the plan. The roof may have a different number of rays. The larger the room, the more rays can be set. It should be remembered that the shed roof to build their own hands a lot easier than hipped.
Step №5. Finishing the interior. After the design is fully settled, it is possible to start the internal finishing. At this stage, installed furnace equipment, plumbing communication, installed windows and doors.
Following these instructions, you can install the bath dream that will delight for its quality and durability.
Other channels of the article:
7 inviolable precepts in the bath
Bath for the joints - the benefits and harms?
Helpful information? Do not forget to Like and subscribe "Bath - from A to Z"!