Brick stove for a bath with his hands: instructions for beginners

  • Dec 24, 2019

Neither room is complete without a good-quality furnace and fireplace correctly folded his hands under the force is not for everyone. The construction of this structure may have a mass imperceptible at first sight difficulties, and if you decide to engage in a device of bath furnace yourself, this issue should be studied in more detail. Consider a step by step construction of bath furnace of bricks.

Selection and construction material

Before starting work it is important to make the correct drawing with dimensions. He will not make mistakes when purchasing materials and construction. The dimensions of the furnace are determined by the total area of ​​the bath and steam, in the most common design includes a water circuit, which can be located in the lower part of the furnace or from the top.

For the construction of bath furnace will need:

  • durable refractory bricks,
  • solution container,
  • clay,
  • for a marking tool
  • trowel and level,
  • insulation materials

Also need to be very metal tank with pipes and other elements (doors, grate, etc.).

instagram viewer

Brief step by step guide

When the material and the tool is prepared, a place for the furnace device is determined, it is possible to start the base arrangement.

Step 1. base apparatus. Making layout for the foundation by means of pegs and ropes, tearing pit depth 50 cm. We fall asleep bottom of sand and gravel, set the formwork along the contour of the pit. Fasten the valve and fill solution. Once the cement hardens - remove the formwork, cover the area with liquid bitumen and isolate roofing material.

Step 2. Preparation of the solution. Knead clay for the brick solution. Grind clay, fill material and water form a homogeneous mush. Add the sifted into the sand, the solution is ready for use.

Step 3. Masonry furnace. In accordance with the selected project, put a brick on the prepared substrate row by row. It is important to observe the vertical and horizontal level of each row to the design is already too strong. In places set design and install door tank, forming a chimney.

Only that the construction of the furnace can not be entered directly into the operation. It should thoroughly dry. To speed up the process it is necessary to open the doors and windows. To begin operation of the unit can only be later 4-5 days after the construction.

Other channels of the article:

7 inviolable precepts in the bath

Bath for the joints - the benefits and harms?

Helpful information? Do not forget to Like and subscribe "Bath - from A to Z"!