Good afternoon, dear guests and subscribers of the "Build for Myself" channel!

I recently published an article that describes in detail each stage of the construction of a metal frame, despite the fact that I did it myself without involving any craftsmen. Instead of a partner, several clamps helped me with this :-)))

Photo of the author
Photo of the author

The metal frame of the stairs came out to me at 22,400 rubles. and 20 evenings after work (three weeks in the evenings).

Here's a link to this article: Metal staircase. DIY frame. Total cost [Many photos]

Author's illustration

Since our town is small and the private sector predominates, you already know everyone in the district. Among the tenants, there are several peasants by profession - a welder. Just, I have repeatedly turned to them for the calculation of work on the construction of a metal frame. Prices are different for everyone: from 58,000 to 90,000 rubles.

Photo of the author

The other day, one of them, passing by my house, looked in - to ask how my stairs were going. We talked, the hour passed unnoticed, and that's what we managed to find out ...

instagram viewer

Firstly, since I cooked myself and held the inverter for the first time, the seams were not welded deep enough, especially the vertical and ceiling seams. He took my apparatus and in 15-20 minutes he eliminated the flaws on the supporting elements. As he said in a language I could understand: melted my seams and welded the joint in depth.

The second mistake, although not entirely a mistake, is aesthetics. The master, not doing for himself, is trying to sell the presentation, but the fact that all this will be sheathed - he does not care, the client needs beauty, then it's nice to buy the product! In spite of the strong welded seams, I have a lot of blunders that will disappear, of course, but the master is thrown into eyes, hence the price, since a professional cleans every little thing after welding and brings it to an aesthetic beauty!

Third, there are large gaps between two metal parts, the cuts of which are made by a grinder. The pros make them "butt-end" and on the machine instead of the grinder, creating an ideal weld pool. I also have discrepancies of 3 and 4 mm, which I welded in two passes. Accordingly, - 2, or even 3 times more electrodes.

Fourth, you need to pay off the machine (cutting equipment), when using which - all cuts and angles on all elements of the stairs are the same.

The master also explained that the partner / assistant also needs to be paid: bring it, have a drink, give it - then it’s okay: in a week, if he said, he would do it.

Of course, the work of a professional does not compare with mine, but I am glad that a knowledgeable person explained to me everything what makes up the price. But I am also glad that I did it myself, saved money and learned how to work with metal.

I summarize

For the first time - you can't do without blunders! And if you decide to assemble something from metal with your own hands, and besides, you know that you have not mastered welding enough, ask a specialist to boil the seams. Not everything is possible, but at least the part that carries the main load.

Thank you for your attention, and I will be glad if the article was useful to you!

Stone base: strong and beautiful DIY stone laying! (features)

Impact screwdriver? What I have not regretted (Review)

How to decorate a house inexpensively and beautifully? Evaluate the budget version of the brick (I tell you how I made the masonry)