At our dacha, electricity is centrally cut off in late autumn. Such actions, according to the chairman, are a compulsory measure. Firstly, in winter, the load on the network increases, due to the fact that careless summer residents turn on the heaters at full power. There is a strong drawdown of the line. Secondly, in winter there is a high probability of theft of electricity. And even more losses on the line. Therefore, the current falls only in the summer.
Do you want electricity in winter? Then please, pull a separate line to the transformer substation. I had a great desire to have voltage in the network, because the construction is underway, it is necessary to erect a roof, and the finishing can be done if the house-bath is heated slowly.
In order to find out the amount for materials and work, I invited an electrician who serves our SNT. As a result, the scope of work became clear:
- 18 pillars
- 375 meters SIP cable 2 * 16
- Installation of a meter on a TP
- Network connection.
The material cost me 5,000 rubles. These are rasskhodniki.
The wire itself pulled 10,000 out of me.
After purchasing material for a separate line, an electrician arrived. He dragged the cart with the wire and carried out the installation. Alone I rode 18 poles and made a connection to the TP. Hanging my drawer on the front.
Everything about everything took him 8 hours of work, I did not think that he would do everything so quickly.
As he asked, he gave 10,000 thousand for the completed robots. It seems like a large sum, but his work is dangerous. For example, I won't climb a pole, life is more expensive. That's just because of the last factor, I think that the work done was not too expensive.
Why did I go to plumbing, I had to be an electrician ...